The uncertainty in the schedule itself was cited as an additional reason for not investing time to update the 4D aspects. The lesson learned from this is that the construction scheduling aspect of the 4D software must be sufficiently sophisticated to allow definition of logical high level task to task type relationships so that construction process changes can be made with the minimum of effort, by changing the rules governing the schedule, rather than by disconnecting and then reconnecting the logical relationships between the detailed tasks. In this way detailed tasks would not have to be redefined and re-associated with physical model objects. At the time, Tekla Structures did not support this level of sophistication in task scheduling. 9.8.4.4 Fabrication and installation of structural steel components The bridge model was shared with the steel fabricator, Rautaruukki, who supplied the project with steel parts and assemblies
make sure that a new flange gasket is used on temperature, with a tachometer connected in perfectly clean mating surfaces. accordance with the manufacturer's 11 On manual choke models readjust the instructions. choke cable on reconnection, as described in 4 With the engine switched off, partially open Section 9. the throttle by moving the cable at the 12 When reconnecting the vacuum pipe carburettor. Close the choke plates with the make sure that the fuel trap is correctly 13.6 Weber 2V carburettor fast idle fingers and hold them closed while the throttle positioned. adjustment - XR3 models