Vajad kellegagi rääkida?
Küsi julgelt abi LasteAbi
Logi sisse
Sulge

"waiver" - 1 õppematerjal

Kuidas muudab mudelprojekteerimine teraskonstruktsioonide valmistamist ja ehitamist
228
pdf

Kuidas muudab mudelprojekteerimine teraskonstruktsioonide valmistamist ja ehitamist

275,000 cfm (130 m3/s) was needed. The CFD graphic gave the fire department its first understanding of how the building worked (Post, 2003). Even though the project did not have an all encompassing BIM model, 3D tools were used throughout the design phase. MKA created a three-dimensional wireframe model for structural analysis and Seele used their wireframe model to design the curtain wall. Seele’s wireframe model, accompanied with a liability waiver, was used as the basis for creating the intelligent Tekla model, showing all the diagonal steel as well as the complex connections. Ambiguity in the contract language, as to who was supposed to share which models created a certain amount of confusion and delays on this project. Because the diagonal steel and the curtain wall were being designed in different countries, it was absolutely vital to have an accurate 3D representation of the entire structure. Achieving a

Ehitus → Ehituskonstruktsioonid
24 allalaadimist


Sellel veebilehel kasutatakse küpsiseid. Kasutamist jätkates nõustute küpsiste ja veebilehe üldtingimustega Nõustun