Kuidas muudab mudelprojekteerimine teraskonstruktsioonide valmistamist ja ehitamist
with Trimble Robotic Total Stations and LM80 Handheld Software, only one person is
needed to determine the exact location of a concrete slab edge or an anchor bolt. Once the
foundation or other site work is complete, the field crews can quickly resurvey the site to
gather the actual bolt locations and other data from the filed and transfer it back to the
81
original 3D model to create as-built drawings (Swinerton pushing BIM to the field, 2010).
This two-way link enables the contractor to quickly and accurately use the data in the
BIM model to position a wall, without having to measure from a previously built
structure thus avoiding tolerance stacking.
Site superintendents are utilizing building models to solve complex construction issues
before they develop into serious problems. For example the visualization capabilities of