Vajad kellegagi rääkida?
Küsi julgelt abi LasteAbi
Logi sisse
Sulge

"submittals" - 1 õppematerjal

Kuidas muudab mudelprojekteerimine teraskonstruktsioonide valmistamist ja ehitamist
228
pdf

Kuidas muudab mudelprojekteerimine teraskonstruktsioonide valmistamist ja ehitamist

schedule for a complex structure (Whited & Gatti, 2007). During construction, problems tend to amplify when the wrong steel arrives at the wrong time on the jobsite due to poor tracking by the fabricator. Moreover, it can be very difficult to explain complex erection schedules to the steel crew based on 2D drawings. Additionally, explaining field discrepancies to the project managers and detailers can be frustrating when the project only uses paper-based documents. Shop-drawing review and submittals can take weeks and even then there might be several issues that have not been discovered. Two dimensional drawings allow for a very limited clash detection process, which is based on the engineer manually comparing hundreds of drawings and trying to visualize which elements might come into contact. It is becoming increasingly common for clients to demand compressed schedules and tighter budgets for their projects. Many engineering and construction firms are motivated

Ehitus → Ehituskonstruktsioonid
24 allalaadimist


Sellel veebilehel kasutatakse küpsiseid. Kasutamist jätkates nõustute küpsiste ja veebilehe üldtingimustega Nõustun