Vajad kellegagi rääkida?
Küsi julgelt abi LasteAbi
Logi sisse
Sulge

"overruns" - 1 õppematerjal

Integration of Lean Con-and Building Information Modelling
109
pdf

Integration of Lean Con. and Building Information Modelling

develops a product that is very complicated and expensive to construct. Inconsistency, inaccuracy, and uncertainty in design make it difficult to fabricate materials offsite, and the fact is that most construction work must be carried out on site, where working conditions are more unpredictable than in a factory. Working on site instead of in a factory is conducive to ineffective work, resulting in rework, working slowly and inventing work, thus leading to cost and time overruns. It creates the brick wall effect: the results of preceding stages will be thrown over the wall into the hands of other project parties, and this causes a loss of information and competence. However, the flow of accurate information in project-based delivery systems (the construction industry) is crucial for successful project outcomes. In general (this applies to both contracting approaches), if a contractor has made a bid under the actual

Ehitus → Ehitusjuhtimine
70 allalaadimist


Sellel veebilehel kasutatakse küpsiseid. Kasutamist jätkates nõustute küpsiste ja veebilehe üldtingimustega Nõustun