Integration of Lean Con. and Building Information Modelling
K.
4. Ballard G. (2008), "Target Value Design", www: http://p2sl.berkeley.edu/2009-05-
26/Glenn%202008-07-29%20=%20Target%20Value%20Design.pdf.
5. Ballard G., Tommelein I., Koskela L., and Howell G. (2002), "Lean construction tools and
techniques (Chapter-15)." in Design and Construction: Building in Value, Oxford-England-UK,
227-255.
6. Ballard G.s and Howell G.s presentation at (November 2009), "Karlsruhe- Lean in Public
Sector".
7. Beard J. L., Wundram E. C. and Loulakis M. C. (2005), ,,Design-Build: Planning Through
Development".
8. Bicheno J. and Holweg M. (2009), "The Lean Toolbox"
9. buildingSMART allianceTM (2009), "BIM Project Execution Planning Guide Version 1.0.",
within the Computer Integrated Construction Research Program, www:
http://www.engr.psu.edu/ae/cic/bimex/download.aspx.
10. Construction Industry Institute- CII (2005), "Lean Principles in Construction", Research
summary 191-1.
11