Vajad kellegagi rääkida?
Küsi julgelt abi LasteAbi
Logi sisse
Sulge

"krygiel" - 1 õppematerjal

Integration of Lean Con-and Building Information Modelling
109
pdf

Integration of Lean Con. and Building Information Modelling

3.12). During the BIM process, data is collected and integrated into the building information model throughout the entire facilitys lifecycle, and can then be used whenever needed, e.g., for exploitation, renovation or demolition. One 52 possible and fast way of sharing information is using the model synchronization method over the internet. This is a fast way of sharing information. Krygiel, Eddy and Nies, Bradley (2008) defined the integrated use of a model as shown in figure 4.1. Workflow is divided into four collaborative steps (adapted): 1. Architects and consultants work on the same model; 2. Stage of refinement, where the model is passed to the contractor and building team 3. Model is adjusted to reflect the change that happened in the field. 4. Then it is shared with owner and facilitys maintenance operators Figure 4

Ehitus → Ehitusjuhtimine
70 allalaadimist


Sellel veebilehel kasutatakse küpsiseid. Kasutamist jätkates nõustute küpsiste ja veebilehe üldtingimustega Nõustun