Prior to bidding
the project, LPR provided a preliminary “Structural Steel Alignment Plan” to the
fabricator, which required incorporation of XYZ survey coordinates into the Tekla model.
All the primary columns (sloping and vertical) were detailed and fabricated with shop
drilled “alignment control holes” designed to hold a surveyors prism at a theoretical point
in space (Figure 19). In addition, a second survey location was fabricated into the
member utilizing a centerpunch mark to locate and install a reflective tape target (Figure
20) on the surface of the column. Total Station surveying instruments were programmed
with this information.
Figure 19. Total Station Surveying Target in the Field (left). Figure 20. Modeled Targets
on a Wide Flange Column (Curtis Mayes, personal communication, May 10, 2010).
The project routinely had very large skewed gusset plates that were shop fitup and shop
welded