Integration of Lean Con. and Building Information Modelling
Samuti tahan
tänada Tallinna Tehnikakõrgkooli õppejõudusid, ettevõtteid ja kõiki teisi osapooli, kes olid seotud või
kaasatud sellesse uurimustöösse.
92
6.6 Bibliography
1. AIA and AIA California Council (2007), "Integrated Project Delivery: A Guide, Version 1",
www: http://www.aia.org/contractdocs/AIAS077630.
2. AlSehaimi A., and Koskela L. (2008), ,,What can be learned from studies on delay in
construction?", 16th Annual Conference of the International Group for Lean Construction,
IGLC-16, Manchester, UK.
3. Ballard G. (2000), ,,The Last Planner System of Production Control.", PhD thesis, Dept. Of
Civil Engineering, University of Birmingham, Birmingham, U.K.
4. Ballard G. (2008), "Target Value Design", www: http://p2sl.berkeley.edu/2009-05-