Ehituskorraldus
JÄRGMINE PRETENDENT
3.5.2. PAKKUMISKUTSE DOKUMENDID
1) PAKKUMISKUTSE JA EELPÄRING (KAHEETAPILISEL
VÕISTLUSEL )
2) EHITUSE KAVAND ( PROJEKTDOKUMENDID )
3) EHITUSE TÖÖETTEVÕTU PROGRAMM (LEPINGU KÕIGE ÜLDISEMAD
TINGIMUSED )
PAKKUMISKUTSE :
· TELLIJA NIMETUS JA AADRESS
22
· HANKE NIMETUS JA ISELOOMUSTUS
· EHITUSE ALGUS JA KESTUS
· PAKKUJATE KVALIFITSEERIMISE TINGIMUSED
· PAKKUMISKUTS DOKUMENTIDE VÄLJASTAMISE KOHT JA
KORD
· PAKKUMISE- JA EHITUSAEGSED TAGATISED
· PAKKUMISE ESITAMISE TÄHTAEG JA KOHT
· TÖÖETTEVÕTU KORRALDUSE MEETOD
* NÕUDED HINNAKUJUNDUSELE
EHITUSE KAVAND :
PEATÖÖVÕTU MEETODI PUHUL ON SOOVITAV ENNE
VÕISTUPAKKUMIST OMADA HEAKSKIIDETUD JA
KOOSKÕLASTATUD TEHNLIST KAVANDIT
PROJEKTEERIMIS- EHITUSLEPINGU PUHUL EELKAVAND
JUHTIMISLEPINGU PUHUL ON VÕIMALIKUD KÕIK VARIANDID