Ehituskorraldus
· PROJEKTEERIMISJÄRGUD JA TÖÖETTEVÕTU SKEEM
· EHITUSJÄRGUD
· EHITUSE FUNKTSIOONID, KORRUSTE, SEKTSIOONIDE JA
KORTERITE ARV
· ELAMUSSE TULEVATE ETTEVÕTETE OTSTARVE, VÕIMSUS
JNE
· NÕUDED INFRASTRUKTUURI PROJEKTEERIMISEKS
· NÕUDED KANDETARINDITELE, VÄLISPIIRETELE,
VIIMISTLUSELE. KVALITEEDINÕUDED
· NÕUDED PROJEKTEERTAVALE TOOTMISTEHNOLOOGIALE
· SOOVITUD TEHNILISMAJANDUSLIKUD NÄITAJAD ( VÕIMSUS,
MAHUTAVUS, RESSURSIKULU, SAASTE JA JÄÄTMEKOGUSED,
MAKSUMUSLIMIIT, TASUVUSAEG JM )
· JUHISED MAKETTIDE JA MUU
DEMONSTRATSIOONIMATEJALIDE KOOSTAMISEKS
· NÕUDED KRUNDI HEAKORRASTAMISEKS
· KESKKONNAKAITSE NÕUDED ( ÕHK, VESI, MAA )
33
· NÕUDED KAITSERAJATISTELE
· EHITUSE ALGUS JA LÕPP
PROJEKTEERIMISÜLESANDELE LISATAKSE ESKIISPROJEKT
4.4. PROJEKTEERIMISTÖÖ KORRALDUS
PROJEKTEERIMISTÖÖ TULEMUSLIKKUS :
· KASUTUSKULUD
· EHITUSKULUD