Tower Bridge presentation
Robert Kasela
10A
2009/2010
The bridge takes its name from its
location, not its design.
Designed by Sir Horace Jones and
engineered by Sir John Wolfe-Barry.
Employed 432 construction workers.
The total cost of construction was
£1,184,000.
Sir H.Jones Sir
Total length 244 meters (801 ft)
Hight 63 meters
Opened 30 June 1894
Clearance below 8.6
meters (28 ft)
70,000 tons of concrete were sunk into the
riverbed to support the construction.
Over 11,000 tons of steel provided the
framework for the towers and walkways.
Tower Bridge is also simply
one of the most unique
venues in London for
weddings, private and
corporate events.
The lifting of Tower Bridge has become a must
see event for visitors to London.
Six people were injured on May 2009, when a
lift in Tower Bridge, central London, fell 3m .
Robbie Maddisons bac...