splicing taping (spot) MA426; NR? MA428; NR? Quality control Thermotube heating; Wire long taping NR? MA4329; NR? Gaskets placing and fixing; contact housing (2) MA430 Electrical test& labeling MA431 # Quality control (100%)
EESTI MEREAKADEEMIA Laevamehaanika õppetool Kursusetöö Õppeaines Laeva abimehhanismid Rooli masin Kadett: Sergei Dombrovski Õppegrupp: MM42 Õppejõud: Jaan Läheb Kursusetöö: Laeva abimehhanismid 2 Sergei Dombrovski MM42 Tallinn 2013.a. Sisukord SISUKORD............................................................................................................................. 2 KURSUSETÖÖ ÜLESANNE................................................................................................ 3 1.SELGITAV OSA...................................................................................................
delivered on time The Contractor wants a competitive edge by using a lower class of pipe, no failures and completed on time The Supplier/Manufacturer wants to preserve the brand name of the product and to secure this and future applications against competing products The Designer wants to ensure that the piping system performs but not to the extent it is over designed Fittings Class Fittings do not meet Flanges & Stub Ends all pipe classes Gaskets Injection moulded Expansion Bellows fittings Saddles Manufactured fittings Tees Bends Manifolds Specials Beam Theory Pipe Stress Beam Theory Pipe Stress Beam Theory Pipe Stress Piping Layout Piping connecting Supports equipment Use existing steelwork Flexibility Saddles-Local Stresses Number and type Springs Fittings Hangars
out the following: breaker points (Section 25) Renew the engine oil and filter (Section 6) Check and if necessary top-up the manual transmission On OHV and HCS engines, remove and clean the oil oil (Section 26) filler cap (Section 7) Check the automatic transmission fluid level - where Check the hoses, hose clips and visible joint gaskets for applicable (Section 27) leaks and any signs of corrosion or deterioration (Section 8) Check the operation of the automatic transmission Visually check the fuel pipes and hoses for security, selector mechanism (Section 28) chafing, leaks and corrosion (Section 8) Check the driveshafts for damage or distortion and
determining the amount of air required for the fire safety system. Fabrication Seele, located in Germany, was responsible for the cladding preconstruction services, the production and installation of 128,000 square feet (11,900 m2) of exterior cladding comprising of more than 6,500 glass panels and 30,000 anodized aluminum profiles. The building’s faceted skin geometry required extensive 3D engineering as the facade surfaces of aluminum extrusions, silicone gaskets, triple-glazing panels, pressure plates, gutters and closing panels join in up to five different angles at particular node points. A 36 comprehensive digital 3D model of the entire facade provided the manufacturing data for all prefabricated elements as well as the related labeling information, packing lists and transportation schedules (Menges, 2006). Figure 10