Kuidas muudab mudelprojekteerimine teraskonstruktsioonide valmistamist ja ehitamist
drawings. The second reason is, there are always inspections, the city wants to have a
hard copy of exactly what was built, at that time, they would not accept this 3D
100
model as the as-built, they still wanted 2D drawings, with an engineer’s stamp on it.
The technology is not the problem, it’s the legalities I guess.
9. Describe the coordination process with other trades (clash detection)? Did you feel an aura of
collaboration.
The GC (M.A. Mortenson) did the clash checking with our models and other trades
and reported to us (Dowco) via Webex / Emails when where changes needed to be
made.
What exactly is the Webex?
Now Webex has be bought by this software called goTo Meeting. It just an online,